•  Email: [email protected]
  •  Whatsapp: +8617638132352
  • 
  • 
  • 
  • 
  • 
Henan Zlin Heavy Industry Co., LTD
  • Home
  • Product
    • Transport Truck
    • Passenger Vehicle
    • Engineering Machinery
    • Farm Machinery
    • Concrete machinery
    • Spare Parts
    • Mini bus
    • Light truck
  • Solution
  • About Us
    • History
    • Research & Development
  • Services
    • Maintenance Service
    • Data download
    • Product Parts
  • Cases
  • News
  • Contact Us
    • Join Us

EN
  • Chinese
  • Philippines

×
  • Home
  • Product
    • Transport Truck
    • Passenger Vehicle
    • Engineering Machinery
    • Farm Machinery
    • Concrete machinery
    • Spare Parts
    • Mini bus
    • Light truck
  • Solution
  • About Us
    • History
    • Research & Development
  • Services
    • Maintenance Service
    • Data download
    • Product Parts
  • Cases
  • News
  • Contact Us
    • Join Us

Home > Standard Operating Procedures for Concrete Transfer Pumps

Home > Standard Operating Procedures for Concrete Transfer Pumps

Standard Operating Procedures for Concrete Transfer Pumps

  • Time: 2023-07-27
  

How to use the concrete transfer pump?ZLIN Heavy Industry is a company with many years of experience in manufacturing concrete transfer pumps.The following is our summary of the operation process of the concrete transfer pump, have you mastered it:

1.Chassis pick-up operation process
Driving pumping switching in the cab to complete, pick-up operation before hanging the neutral gear pull the hand brake, press the pick-up switch. Take power to complete and then hang into the appropriate gear, generally hang 1:1 speed ratio gear.

2. After completing the power take-off and engaging the gear, it is necessary to unfold the outriggers and levelling under the near-control state.
Levelling needs to observe the level meter next to the outrigger multi-way valve, the pump truck installed with electronic level meter needs to observe the level data on the display in time. The outriggers need to be placed on the pads, the site must be hardened, parked smoothly and firmly, with good drainage facilities to prevent collapse.

3. After the outriggers are unfolded, switch to the remote control state and then open each section of the boom in turn.

4. Concrete pumping and construction
Before taking over the use of the delivery pipe of the concrete pump truck, it should be carefully inspected, if there are cracks in the pipe wall, wear and tear, serious wear and tear of the pipe body, damage to the joints and other phenomena, it should be repaired or stopped, in order to prevent accidents from occurring under greater pressure when pumping concrete. Lubricate the pipe with a small amount of mortar before pumping. When pouring pumped concrete on site, no one should stand within 1 metre on both sides of the conduit to prevent the conduit from swinging and hurting people.

5. Flush the pipeline by back pumping, inhaling sponge balls or water after pouring is completed

6. Wrap up and finish the work on the project
The main idea hose before the arm is closed in time to return to the position, the first remote control to recover the arm and then switch to the near control to recover the outriggers, and then in the driver's cab will pick up the power to switch to the driving state of the triumphant return.

    ZLIN Heavy Industry reminds you to pay attention to the following matters:

    1. The operator of the concrete pump shall be specially trained to be familiar with the mechanical properties of the pump truck, master the operation methods and precautions of the pump truck, conscientiously perform the safety duties of the post in production, and comply with the relevant safety regulations on site.
    2. Concrete pumps used to convey concrete should comply with the use and operation regulations, pipeline joints, safety valves must be intact, pipeline shelves must be firm, and with the pumping part of the structure of the template disengaged from the self-supporting system, before conveying the first water test, maintenance must be unpacked, and must be sent after the maintenance test.
    3. When using concrete with additives, the person who mixes the additives must operate carefully and be careful to prevent corrosion injury.
    4. When connecting the pumping pipe, the erection must be reliable and firm, and when it is suspended across, the steel pipe row frame must be set up, and in order to prevent the pumping process from swinging, the anchoring steel reinforcement can be used.
    5. The connection of the conveying pipe of the concrete pump truck must use the intact special card bolt, and there should be spare card bolt and wearable accessories during construction.
    6. Before the concrete pump truck works, there must be perfect communication means in the pump truck site and concrete construction silo so that the construction can be carried out safely.

    Concrete pump is a well-received product of Zlin Heavy Industry, ZLIN Heavy Industry is a large-scale construction machinery and equipment enterprise integrating scientific research, production, sales and after-sales service.

    Chat [email protected]  Inquiry

    Contact Us

    • Phone: +8617638132352
    • Email: [email protected]

    Leave a message

    Related Cases

    • ZLIN-3.5 Self-loading mixer shipped to Kenya →
    • Concrete Trailer Pump For Sale →
    • Philippines JBS40R cement mixer with pump →

    Related Products

    • 0.8t Mini Excavator

      Type: Mini Excavator
      Power: 22KW

    • 1.8 m³ Self-Loading Mixing Truck

      Rated Power: 78kw

      Pump: CBFC50/40

    • HZS25 Mini Mixing Concrete Batching Plant

      Theoretical Productivity : 25m³/h
      Mixing Power: 18.5kw

    Contact

    Focuses on the R&D and manufacturing of construction machinery.

    • 
      Email : [email protected]
    • 
      Phone : +8617638132352
    • 
      Add : Zhengzhou City, Henan Province, China view map +

    Product

    • Transport Truck
    • Passenger Vehicle
    • Engineering Machinery
    • Farm Machinery
    • Concrete machinery
    • Spare Parts
    • 
    • 
    • 
    • 
    • 

    About

    • About Us
    • History
    • Research & Development

    Solution

    • Solutions for Self-Loading Concrete Mixer
    • Solutions for Concrete Mixing Plants
    Copyright © 2016 by Henan Zlin Heavy Industry Co., LTD All rights reserved Return to top
    •  Chat
      Chat online
    •  Inquiry
      Leave a message
    •  Tel
      Tel: +8617638132352
    •  Email
      Email: [email protected]
    •  Whatsapp
      Whatsapp: +8617638132352
    •  Top

    Products

    >

    • Products
    • Company news
    • Industry news
    • Data download
    • Product Parts
    • Solution
    • Customer Case
    • Cooperative
    • Exhibition

    Send Message

    • Dongfeng C37 Mini Bus
    • Toyata Coaster Mini Bus
    • Rvyue R6 Mini Bus
    • FOTON G9 Mini Bus
    • FOTON Toano Mini Bus
    • Dongfeng A08 Mini Bus
    • Other
    *
    *
    CHAT ONLINE 
    • Dongfeng C31 Mini Cargo Truck
    • Dongfeng Captain E 2-4T Light Cargo Truck
    • Dongfeng CAPTAIN T 1-3T Mini Truck
    • FOTON AUMARK LIGHT CARGO TRUCK
    • ISUZU 100P 2-4T CARGO TRUCK
    • KAMA 1-3T MINI TRUCK
    • Other
    *
    *
    CHAT ONLINE 